Could have drawn up a diagram of the patch panel to make it easier for punch downs. Should have reviewed the purchase order with the Technology Coordinator, e.g., size of raceways. |
Homepage / Design\Preparation of Plans / Preparation of Materials
On-Site Evaluation / NetDay / Improvements / Special Thanks / Contacts