Cable Routing and Mounting Continued
Cable typically comes on spools, which prevents it from bending or breaking.
As you prepare the horizontal cables, you should label them with the location of the area being served.
EIA/TIA-606 specifies that UTP should be labeled at both ends to ensure that it can be easily identified for troubleshooting or replacement.
Labels should also conform to legibility, defacement, and adhesion requirements specified by the Underwriters Laboratory.