Project 3: Creating A Data Cube

  < Previous  Next >

Due Date

See the calendar for due date.

Objectives

  1. To become familiar with OLAP data cube creation
  2. To learn how to work with measures and measure groups
  3. To learn how to create time dimension and hierarchy
  4. To learn how to relate dimensions to measures in a data cube

Data Sources:

  1. Your MaxMinManufacturingDM-<yourInitials> relational database located on your WBIxx server.

Directions

Complete the following Learn By Doing (LBD) sections:
Note:
  1. Building a Multidimensional BI Semantic Model for the Manufacturing Data Mart (pp. 328-333)
    Create an OLAP data cube MaxMinManufacturingDM-<yourInitials> on top of your MaxMinManufacturingDM-<yourInitials> data mart relational database
  2. Working with Measures and Measure Groups (pp. 342-345)
    Add a measure and a measure group to the data cube and create calculated measures
  3. Cleaning Up the Dimensions in the MaxMinManufacturingDM-<yourInitials> cube (pp. 347-351)
    Create a time dimension and Date, Material, Plant and Product hierarchies for the cube
  4. Relating Dimensions in the MaxMinManufacturingDM-<yourInitials> cube (pp. 351-352)
    Relate cube dimensions to measure groups
Note: Grading will be performed on your assigned virtual machine.

Rubric:

Points      Item
----------  --------------------------------------------------------------
            Building a Multidimensional BI Semantic Model
_____ / 10  Creating AS and DM project
_____ / 10  Creating data source view
_____ / 10  Creating data cube

            Working with Measures and Measure Groups
_____ / 15  Adding formatting to a measure, adding measure group
_____ / 10  Creating the calculated columns

            Cleaning Up the Dimensions in the MaxMinManufacturingDM-<yourInitials> Cube
_____ / 10  Creating time dimension
_____ / 15  Creating hierarchies
_____ /  5  Hiding unneeded attribute hierarchies

_____ / 10  Relating Dimensions in the MaxMinManufacturingDM-<yourInitials> Cube

_____ / 95  Total