The Project

Our project was to complete the networking of West Las Vegas Middle School and High School.

   West Las Vegas Middle School was networked in the Spring of 1997. The design was completed by Annabella Flores, a former Computer Science student.

   West Las Vegas High School was partially networked in the Spring of 1998. This design was completed by David Reinsvold, also a Computer Science student that is trying to graduate from Wayne's Wrath. J/k!
 
 

    So what do we have to do with all of this?



Our responsibilities included the following:
 

West Middle School

1) Hub and patch panel in computer lab need to be installed.
2) Inserts need to completed in one wing of classrooms.
3) Survey of stations cable needs.
4) Check all connections for connectivity.
 
 

West High School

1)  Counselor's office needs raceway, outlet box, punch down, and
tested.
2)  Room #6 (I think that's the right number), Christine Rodriguez'
classroom, needs raceway, outlet box, punch down, and tested.
3)  The Annex needs the aerial cable.  Once that is done, the hubs need
to be put in, and then testing done.
4)  The Music Building needs the aerial cable.  Once that is done, the
hub needs to be put in and testing done.
5)  The hub still needs to be put in at the (old) business lab. It is a
regular classroom now, since the business lab was moved down to the new
Tech Center.  Perhaps it just needs an outlet box, punchdown, and
testing; however, there are all kinds of wires sticking out in that
classroom in anticipation of a hub.
6)  And, of course, the connection in the Library is still super, super
slow.